EMARAT ALOULA INDUSTRIES

 

 

 

Project Specific Work Instruction (Active)

 

 

Number

Description

Rev.

Date

 

EAI Fabrication Services

 

 

AWI 103-259125

Standard Filing System

1

2-Mar-20

Attachments

 

 

 

01

Standard File Label

1

2-Mar-20

02

Standard Responsibility Matrix for Filing Index

1

2-Mar-20

TWI 115-259125

Passive Fire Proofing (PFP) of Structural Steel Procedure

1

2-Mar-20

Attachments

 

 

 

01

Fire Proofing Inspection Report

1

2-Mar-20

02

Work Process Flowchart for Passive Fire Proofing Application

1

2-Mar-20

03

Sample Photos of Passive Fire Proofing (PFP) Application, Finished Product and Machine

1

2-Mar-20

AWI 211-259125

Documents/ Drawings Control

3

20-May-20

Attachments

 

 

 

01

Documents/ Drawings Numbering System

1

20-Jan-20

02

Vendor Documents & Drawings Register (VDDR)

2

20-Jan-20

03

In-House Approval Stamp

1

20-Jan-20

04

Document Transmittal

1

20-Jan-20

05

In-House Approval Stamp for QC Documents

1

20-Jan-20

06

Documents Distribution Matrix

0

20-Jan-20

AWI 231-259125

Material Control

2

20-Jan-20

Attachments

 

 

 

01

ERP Process Flowchart - Material Receipt

2

20-Jan-20

02

ERP Process Flowchart - Material Issue from Stores

1

20-Jan-20

03

Process Flowchart for Material Receiving Inspection by QC (Fabrication Services Procured & External Client Supplied Material)

2

20-Jan-20

04

Process Flowchart for Material Receiving Inspection by QC (Internal Client Supplied Material)

2

20-Jan-20

05

Process Flowchart for Material Inspection by QC (Fabrication Services Procured Materials Transferred Between Projects)

1

20-Jan-20

06

Request for Inspection (By QC)

1

20-Jan-20

07

Material Inspection Report

3

20-Jan-20

08

Hold/ Rejected Tag

4

20-Jan-20

09

Stores Material Requisition

1

20-Jan-20

10

Stock Booking Request (for Transferring Material Between Projects)

2

20-Jan-20

11

Material Receipt Voucher (Prepared Through ERP)

1

20-Jan-20

11A

Material Receipt Voucher (Site Returns) (Prepared Through ERP)

1

20-Jan-20

11B

Material Return Slip (Site Return) [from Fabrication Workshop to Stores]

1

20-Jan-20

12

Material Issue Voucher (Prepared Through ERP)

1

20-Jan-20

13

Material Transfer Voucher (Prepared Through ERP)

1

20-Jan-20

TWI 305-259125

Fabrication and Assembly of Skid Packages, Pipe Rack Packages and Modules (Bolted and Welded Construction)

2

2-Mar-20

Attachments

 

 

 

01

Final Punch List

1

2-Mar-20

02

Final Inspection Checklist

2

2-Mar-20

03

Process Flowchart for Fabrication and Assembly of Skid Packages, Pipe Rack Packages and Modules (Bolted and Welded Construction)

2

2-Mar-20

04

Sample Photos of Skid Packages & Modules

1

2-Mar-20

TWI 753-259125

Equipment Maintenance

0

04-Nov-22

Attachments

 

 

 

01

Master List of Equipment

0

04-Nov-22

02

PPM Schedule

0

04-Nov-22

03

PPM Checklist

0

04-Nov-22

04

Breakdown Work Order

0

04-Nov-22

05

Service History Record

0

04-Nov-22

06

Log of O&M Manuals

0

04-Nov-22

07

Equipment/Accessories Control Log

0

04-Nov-22

08

Preservation Checklist

0

04-Nov-22