EMARAT ALOULA INDUSTRIES |
|
|
|
|
Project Specific Work
Instruction (Active) |
|
|
Number |
Description |
Rev. |
Date |
|
EAI Fabrication Services |
|
|
Standard
Filing System |
1 |
2-Mar-20 |
|
Attachments |
|
|
|
Standard
File Label |
1 |
2-Mar-20 |
|
Standard Responsibility Matrix for Filing Index |
1 |
2-Mar-20 |
|
Passive
Fire Proofing (PFP) of Structural Steel Procedure |
1 |
2-Mar-20 |
|
Attachments |
|
|
|
Fire Proofing Inspection Report |
1 |
2-Mar-20 |
|
Work Process Flowchart for Passive Fire Proofing Application |
1 |
2-Mar-20 |
|
Sample Photos of Passive Fire Proofing (PFP) Application,
Finished Product and Machine |
1 |
2-Mar-20 |
|
Documents/ Drawings Control |
3 |
20-May-20 |
|
Attachments |
|
|
|
Documents/ Drawings Numbering System |
1 |
20-Jan-20 |
|
Vendor Documents & Drawings Register (VDDR) |
2 |
20-Jan-20 |
|
In-House Approval Stamp |
1 |
20-Jan-20 |
|
Document Transmittal |
1 |
20-Jan-20 |
|
In-House Approval Stamp for QC Documents |
1 |
20-Jan-20 |
|
Documents Distribution Matrix |
0 |
20-Jan-20 |
|
Material Control |
2 |
20-Jan-20 |
|
Attachments |
|
|
|
ERP Process Flowchart - Material Receipt |
2 |
20-Jan-20 |
|
ERP Process Flowchart - Material Issue from Stores |
1 |
20-Jan-20 |
|
Process Flowchart for Material Receiving Inspection by QC
(Fabrication Services Procured & External Client Supplied Material) |
2 |
20-Jan-20 |
|
Process Flowchart for Material Receiving Inspection by QC
(Internal Client Supplied Material) |
2 |
20-Jan-20 |
|
Process Flowchart for Material Inspection by QC (Fabrication
Services Procured Materials Transferred Between Projects) |
1 |
20-Jan-20 |
|
Request for Inspection (By QC) |
1 |
20-Jan-20 |
|
Material Inspection Report |
3 |
20-Jan-20 |
|
Hold/ Rejected Tag |
4 |
20-Jan-20 |
|
Stores Material Requisition |
1 |
20-Jan-20 |
|
Stock Booking Request (for Transferring Material Between
Projects) |
2 |
20-Jan-20 |
|
Material Receipt Voucher (Prepared Through ERP) |
1 |
20-Jan-20 |
|
Material Receipt Voucher (Site Returns) (Prepared Through ERP) |
1 |
20-Jan-20 |
|
Material Return Slip (Site Return) [from Fabrication Workshop to
Stores] |
1 |
20-Jan-20 |
|
Material Issue Voucher (Prepared Through ERP) |
1 |
20-Jan-20 |
|
Material Transfer Voucher (Prepared Through ERP) |
1 |
20-Jan-20 |
|
Fabrication and
Assembly of Skid Packages, Pipe Rack Packages and Modules (Bolted and Welded
Construction) |
2 |
2-Mar-20 |
|
Attachments |
|
|
|
Final Punch List |
1 |
2-Mar-20 |
|
Final Inspection Checklist |
2 |
2-Mar-20 |
|
Process Flowchart for
Fabrication and Assembly of Skid Packages, Pipe Rack Packages and Modules
(Bolted and Welded Construction) |
2 |
2-Mar-20 |
|
Sample Photos of Skid
Packages & Modules |
1 |
2-Mar-20 |
|
Equipment Maintenance |
0 |
04-Nov-22 |
|
Attachments |
|
|
|
Master List of Equipment |
0 |
04-Nov-22 |
|
PPM Schedule |
0 |
04-Nov-22 |
|
PPM Checklist |
0 |
04-Nov-22 |
|
Breakdown Work Order |
0 |
04-Nov-22 |
|
Service History Record |
0 |
04-Nov-22 |
|
Log of O&M Manuals |
0 |
04-Nov-22 |
|
Equipment/Accessories Control
Log |
0 |
04-Nov-22 |
|
Preservation Checklist |
0 |
04-Nov-22 |